
Add to Cart
2024 Zhonghe Machinery Catalogue 3M.pdf
Product Description-----Excavator Pile driving Boom Arm
What is an excavator piling arm?
An excavator piling arm refers to the specific configuration of an excavator arm when it is equipped or modified for piling.
What advantages do you have?
Advantages of excavator pile driving arm:
1. The thickness of the upper and lower plates of the arm frame is increased, and double reinforcing ribs are used inside. The arm ears are treated with segmented thickened plates at the stress points, which increases the service life of the pile driving arm as a whole.
2. The opening angle between the arm and the arm can reach 160 degrees, and the angle between the arm and the base can reach 88 degrees, which increases the overall drilling and pulling force and work efficiency.
3. The pile driving arm is drilled after welding, and the accuracy is as high as the original arm, which prolongs the service life
Some common size references
Excavator (ton) | Total Length (mm) | Boom (mm) | Arm(mm) | Pilling Height (mm) | Counterweight (ton) |
30-36 | 13800 | 10000 | 3800 | 15400 | 3T |
30-36 | 15000 | 10500 | 4500 | 17100 | 5T |
40-45 | 15800 | 11000 | 4800 | 17900 | 3T |
40-45 | 16800 | 11500 | 5300 | 18500 | 5T-6T |
45-50 | 19000 | 12500 | 6500 | 21000 | 6T-7T |
Product Detail Display
About Hydraulic Vibratory Pile Hammer
1. Some engineering applications:
Municipal sewage pipeline laying, land reclamation, bridge cofferdam, building foundation, high-speed rail foundation treatment, highway soft foundation treatment, wharf engineering, deep foundation pit support, etc.
2. The hydraulic vibratory hammer consists of four main components:
Boom assembly, frame assembly, shell assembly and clamp assembly.
Mainly used for piling, such as driving reinforced concrete piles and steel plate U-shaped piles into the ground to reinforce the foundation, and then support the structure or fix the building.
About Our Company------Zhonghe Machinery
CE certification & Utility model patent certificates
Shipping And Packaging
Our products have been sold to more than 60 countries, and our transportation methods include sea transportation, land transportation, and air transportation. Our packaging is wooden box packaging or stretch film packaging. The goods will be packed before shipment and then loaded into the container to ensure the safety of the goods.
Some questions and answers that may interest you
Q: Are you a manufacturer?
A: We are a manufacturer/supplier of excavator arms and accessories. We have a super large factory with an area several times that of our competitors. We are the largest excavator accessory manufacturer in Guangdong Province with complete production equipment and our products are exported to more than 60 countries around the world.
Q: What is the material of the pile driving arm?
A: We generally use Q355B material. If the customer has higher requirements for the material, we can use Q690D material or other high-strength materials.
Q: How to allocate the boom and arm of the pile driving arm more reasonably?
A: The length of the boom minus the length of the arm is equal to 5.5 meters, which cannot be less than this length. When the boom and arm are folded for transportation, the vibrating hammer will hit the excavator, and the transportation is too high.
Q: What are the design requirements for the pile driving arm?
A: The opening angle between the boom and the dipper of our pile driving arm is basically 160°, and the boom and the horizontal can reach 88°
If you want to learn more details, just contact Ada
Whatsapp: +86 15322105263
Teil/Wechat: 0086 15322105263
E-mail: abby@excavatorboomarm.com